Access, occupation, roof condition and the asbestos assessment all affect the scope and programme. We plan the working hours, staging, asbestos removal and clearance requirements for your site before a programme is agreed.
Tell us how the building is used, when people are on site and what access is available. We'll go through the proposed roofing scope and what information is needed to assess it. Any shutdowns, staging, weather allowances and completion dates are agreed for your particular site.
Asbestos roof jobs involve several trades. You don't have to manage them. We run your project from start to finish, and you deal with one point of contact.
Asbestos removal and disposal — carried out under our management by a licensed asbestos removalist
New metal roof — supplied and installed by Element Metal Roofing
Crane and lifting — sequenced with the roofing work
Edge protection and fall safety — in place for the roofing work
Air monitoring and clearance — arranged as required for your job by an independent assessor
Insulation, ventilation and stormwater — upgraded where included in the scope
One quote, one programme and one number to call. Inclusions and exclusions are written into the quote for your job.
Send us your site details, and we manage the job from first look to final clearance.

Existing asbestos surveys, drawings and roof-condition details help define what needs checking.
.webp)
Access, occupation, staging and weather all shape the sequence and timing.
.webp)
We manage the asbestos removal, roofing and other trades, so you're not chasing contractors.

Old asbestos roofing replaced with a new metal roof system.
Speak to our team for a design consultation, energy upgrade assessment, or pricing for your next project.
Download our Capability Statement for an overview of our commercial and industrial roofing work.
We’ve compiled answers to the questions our customers ask most, helping you make confident and informed decisions.
It depends on the building, the roof's condition and what an asbestos assessment says. If you're planning work, leasing, selling or dealing with leaks, get the roof assessed and talk to us about replacement options.
It depends on roof size, access, occupation and the asbestos removal method. We set out one programme covering the removal and the new roof for each job.
That depends on the site, the asbestos assessment and the removal method. Occupation, exclusion zones, shutdowns and staging are assessed before a programme is agreed.
We confirm before work starts which monitoring, clearance and disposal records are required for your job. They're issued by the licensed asbestos removalist and the independent assessor.
Most projects use Colorbond® or Zincalume® metal systems with upgraded insulation, ventilation and purpose-designed water management.